Vahdat, Kamran (2015) Seismic Risk Management. PhD thesis, University of Leeds.
Abstract
Seismic risk management is a problem of many dimensions, involving multiple inputs, interactions within risk factors, criteria, alternatives and stakeholders. The deployment of this process is inherently fraught with the issues of complexity, ambiguity and uncertainty, posing extra challenges in the assessment, modelling and management stages. The complexity of earthquake impacts and the uncertain nature of information necessitate the establishment of a systematic approach to address the risk of many effects of seismic events in a reliable and realistic way. To fulfill this need, the study applies a systematic approach to the assessment and management of seismic risk and uses an integrated risk structure. The fuzzy set theory was used as a formal mathematical basis to handle uncertainties involved within risk parameters. Throughout the process, the potential impacts of an earthquake as the basic criteria for risk assessment were identified and relations between them were accommodated through a hierarchical structure. The various impacts of an earthquake are then aggregated through a composite fuzzy seismic risk index (FSRi) to screen and prioritize the retrofitting of a group of school buildings in Iran. Given the imprecise data which is the prime challenge for development of any risk model, the proposed model demonstrates a more reliable and robust methodology to handle vague and imprecise information. The significant feature of the model is its transparency and flexibility in aggregating, tracing and monitoring the risk impacts. The novelty of this study is that it serves as the first attempt of the process of a knowledge base risk-informed system for ranking and screening the retrofitting group of school buildings. The model is capable of integrating various forms of knowledge (quantitative and qualitative information) extracted from different sources (facts, algorithms, standards and experience). The outcomes of the research collectively demonstrate that the proposed system supports seismic risk management processes effectively and efficiently.
Metadata
Supervisors: | Smith, Nigel and Amiri, Ghodrati and Moodley, Krisen |
---|---|
Keywords: | Seismic Risk, Risk Management, KBES, MCDM, fuzzy MCDM |
Awarding institution: | University of Leeds |
Academic Units: | The University of Leeds > Faculty of Engineering (Leeds) > School of Civil Engineering (Leeds) |
Identification Number/EthosID: | uk.bl.ethos.655262 |
Depositing User: | Dr Kamran Vahdat |
Date Deposited: | 23 Jun 2015 12:46 |
Last Modified: | 06 Oct 2016 14:42 |
Download
Final eThesis - complete (pdf)
Filename: Full Thesis - 1 June 2015.pdf
Description: Seismic Risk Management
Licence:
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 2.5 License
Export
Statistics
You do not need to contact us to get a copy of this thesis. Please use the 'Download' link(s) above to get a copy.
You can contact us about this thesis. If you need to make a general enquiry, please see the Contact us page.